Project:
Tomato Paste Factory, Jordan |
|
Client |
: |
Shafa Food Co., a Subsidiary of Jordan
Investment Corporation |
|
Starting
Date |
: |
15/02/1994 |
|
Completion Date |
: |
01/08/1994 |
|
Project
Value |
: |
US$
2,746,478 |
|
|
|
The
Project consisted of the construction of 7 main
buildings that included the Production Hanger area
2400m2,
Boilers Hanger area 500m2,
Storage Hanger area 6600m3, Raw Material
Hanger area 300 m3, Administration Building
area 300m2, Cafeteria Building area 250 m2,
Labour Housing area 600m2
In addition
to 5 industrial structures that included Tomato Wash
Collection Pool, Tomato Rising pool, Cooling Tower,
Elevated Water Tank 300 m3, Underground Water
Tank 1000 m3 and
external works.
|
|
Project: Amonia Storage Tank, Jordan |
|
Client |
: |
Jordan Phosphate Mines Company |
|
Main
Contractor |
: |
Tasmi International Spain |
|
Starting
Date |
: |
30/01/1994 |
|
Completion Date |
: |
15/08/1994 |
|
Project
Value |
: |
US $ 985,915 |
|
|
The work
consists of medium depth piles of 12.0 m deep
F1.0 spiral reinforced,
Piles were cast in situ and for 88
No., with recoverable casing.
On the top of piles and raft of 0.5 m
thick specially reinforced for seismic effect was
caste diameter of raft is 3.0 m. Cylindrical columns
(88 No.), 2.0 m ht and 1.0m diameter, were
constructed on the raft to support a suspended slab
of 0.8m thick and 30 cm diameter.
Pipe racks with inserts, special
insulation for Ammonia Tank was also carried
by MID Contracting.
|
|
|
|
|
|
Project:
Rehabilitation of the
Existing Phosphoric Acid Plant of Jordan Phosphate Mines
Co., Aqaba, Phase 1
(Main Subcontractor) |
|
|
Client |
: |
Bogues Coppe Lavallin
tar |
|
Starting
Date |
: |
15/07/1992 |
|
Completion Date |
: |
13/09/1993 |
|
Project
Value |
: |
US $ 2,111,830 |
Execution of suspended slabs to hold the flash cooler and
its supplementary condensers.
Construction of a special built and coated concrete tank
for the acid chemical reaction. The
structure is heavily reinforced 470kg/m3. The method of
construction was according to the project designer (Didie
of Germany) requirements, and of high specs.
Construction of four circular tank foundation Dia = 9.4m
with all the industrial details of channels
and supports.
Construction of a cooling system measuring 90 by 12m. The
structure consists of (18) cells and an internal
channel. Work also includes the construction of hot and
cold water channels around the structure in addition to a
new pumping station.
Construction
of 2 electrical substations.
Construction
of heavy duty electrical cable trenches and ducts.
The
project also included some modifications on:
-
Silica preparation Unit
-
Filtration unit
-
Concentration area
-
Process drainage
trenches
-
Cooling tower pipe and
rack foundations
-
Cable support foundations