International Locations

 

 

 

 

             

 Industrial Projects

Project: Tomato Paste Factory, Jordan

Client : Shafa Food Co., a Subsidiary of Jordan Investment Corporation
Starting Date :

15/02/1994

Completion Date :

01/08/1994

Project Value :

US$ 2,746,478

The Project consisted of the construction of 7 main buildings that included the Production Hanger area 2400m2, Boilers Hanger area 500m2, Storage Hanger area 6600m3, Raw Material Hanger area 300 m3, Administration Building area 300m2, Cafeteria Building area 250 m2, Labour Housing area 600m2

 

In addition to 5 industrial structures that included Tomato Wash Collection Pool, Tomato Rising pool, Cooling Tower, Elevated Water Tank 300 m3, Underground Water Tank 1000 m3 and external works.

 

 

 

 

 

Project: Amonia Storage Tank, Jordan

Client : Jordan Phosphate Mines Company
Main Contractor : Tasmi International Spain
Starting Date : 30/01/1994
Completion Date : 15/08/1994
Project Value : US $ 985,915

 

     The work consists of medium depth piles of 12.0 m deep F1.0 spiral reinforced,  Piles were cast in situ and for 88 No., with recoverable casing.

      

      On the top of piles and raft of 0.5 m thick specially reinforced for seismic effect was caste diameter of raft is 3.0 m. Cylindrical columns (88 No.), 2.0 m ht and 1.0m diameter, were constructed on the raft to support a suspended slab of 0.8m thick and 30 cm diameter.

 

      Pipe racks with inserts, special insulation for Ammonia Tank was also  carried by MID Contracting.

 

 

                                             

Project: Rehabilitation of the Existing Phosphoric Acid Plant of Jordan Phosphate Mines Co., Aqaba, Phase 1

(Main Subcontractor)

Client : Bogues Coppe Lavallin tar
Starting Date : 15/07/1992
Completion Date : 13/09/1993
Project Value : US $ 2,111,830

 

      Execution of suspended slabs to hold the flash cooler and its supplementary   condensers.

 

      Construction of a special built and coated concrete tank for the acid chemical   reaction. The  structure is heavily reinforced 470kg/m3. The method of   construction was according to the project designer (Didie of Germany)   requirements, and of high specs.

 

      Construction of four circular tank foundation Dia = 9.4m with all the industrial   details of channels and supports.

 

      Construction of a cooling system measuring 90 by 12m. The structure consists of  (18) cells and an internal channel. Work also includes the construction of hot and  cold water channels around the structure in addition to a new pumping station.

 

 Construction of 2 electrical substations.

 

 Construction of heavy duty electrical cable trenches and ducts.

 

 The project also included some modifications on:

  • Silica preparation Unit

  • Filtration unit

  • Concentration area

  • Process drainage trenches

  • Cooling tower pipe and rack foundations

  • Cable support foundations
     

 

 

 