 Industrial Projects

Project: Katraneh Cement Plant - Phase I - Jordan

Client : ACC - Arabian Cement Company
Starting Date :

10/2007

Completion Date :

Under Construction

Project Value :

US$ 115,000,000

Phase I of the project consists of: the Construction of a Cement Plant in Katraneh near Amman with a production capacity of 5000 tons/day.

              

This phase incorporates all design, supply and execution of the plant’s facilities (except for the service buildings, (i.e. Management Building, Oil Pumping Stations, Fire Fighting ...etc).

 

The Plant will be constructed from Concrete, Structural Steel, including all infrastructure works, internal roads, fences, water sewerage and water drainage.

 

The works includes the installation, testing and commissioning of all Electrical works (supplied by the Client/ Owner).

 

Mechanical Works divided into two parts:-

 

  1. Supply, install, test and commission for part of the equipment according to 

      the design drawings received from the Client / Consultant.

 

  2. Receipt of materials at site, storage, install, test, commission for main

      equipment that are supplied by the Client/ Owner.

 

   

 

Project: Sea Water Pumping Station and Cooling Pipeline in Aqaba,Jordan

Client : Kemapco - Kemira Arab Potash Company Ltd.
Starting Date : 01/07/2001
Completion Date : 01/06/2002
Project Value : US $ 4,356,192

The work consists of the construction of the seawater intake structure, with screening facilities at level 7.5 meter bellow seawater level, in addition to the construction of pumping station building at 4.3 m below sea water level, including wet excavation, and temporary sheet piling to facilitate excavation for the raft foundations.

 

The work also consists of the construction of the seawater cooling pipeline which involved the construction of 2 no. X 1500mm Dia GRP pipe and of length 150 meters installed in varying depth from 3.6 – 5 m off shore, including dredging, concrete encasement, and temporary sheet piles to facilitate dredging of the trench. Also the construction of F 700 mm GRP feeder pipeline including major box culvert and pipe in culvert, also the F 700 GRP return pipeline 600 m.l. including diffuser 700 m Diam, below sea water level and end connections.

 

 

                                             

Project: Eshidiya Sulphric & Phosphoric Acid Plant Phase I & II , Jordan

Client : Krebs – France
Starting Date : 04/01/1995
Completion Date : 21/03/1997
Project Value : US$ 10,201,446

Located over 300 kilometers south-east of the Jordanian capital Amman, the Construction of Eshidiya Sulphric & Phosphoric Acid Plant posed yet another welcomed challenge in which MID contracting embarked on industrial projects construction.

 

The remote location of the project dictated the utilization of MID Contracting full resources and creativeness. Power, water, paved roads, and communication means were non-existing and our personnel had to overcome these logistical obstacles.

 
 

 