Qatraneh Cement Plant

Print PageSend to friend
Category: 
Industrial
Location: 
Katraneh – Jordan
Engineer name: 
HOLTEC
Client: 
Arabian Cement Company (ACC)
Year: 
2007 - 2010

Value of Contract: 148,000,000 USD

Description:

Phase I: the Construction of a Cement Plant in Katraneh near Amman with a production capacity of 5000 tons/day.

This phase incorporates all design, supply and execution of the plant’s facilities (except for the service buildings, i.e. Management Building, Oil Pumping Stations, Fire Fighting ...etc).

The Plant will be constructed from Concrete, Structural Steel, including all infrastructure works, internal roads, fences, water sewerage and water drainage.

The works includes the installation, testing and commissioning of all Electrical works (supplied by the Client/ Owner).

Mechanical Works divided into two parts:

  1. Supply, install, test and commission for part of the equipment according to the design drawings received from the Client / Consultant.
  2. Receipt of materials at site, storage, install, test, commission for main equipment that are supplied by the Client/ Owner.