International Locations

             

 Roads & Infrastructure Projects
 

Project: The Military Camps Site In Zarqa - Phase I – Pilot Project
(Stag A & Stage E)

 

Client : National Resources Investment & Development Corporation (NARIDEC)
Starting Date : 01/08/2002
Completion Date :

Stage A 15/04/2005

Stage E 11/08/2003

Project Value : US $ 5,795,720

 

The main items of infra-structure works (which spread over an area of 404000 m2 of and area of 294,220.000 m2  of existing military camps) to be carried out include

but are not limited to the following:


 

The construction of roads, The construction of miscellaneous related works such as curbstone, pavement ---- etc., the construction of water supply network comprising of polyethylene and ductile iron pipes including main supply and house connection total length of pipes of different diameters, the construction of wastewater drainage network, the construction of retaining walls, the construction of two underpasses (pedestrian and vehicle),  The construction of storm water drainage network, the construction of the main trank, in addition to Telephone and electrical works. 

 

 

 

Project: Infrastructure Works at Prince Rashid Hospital, Irbid - Jordan

And Prince Ali Hospital, Karak - Jordan

 

Client: Jordanian Ministry of Public Works and Housing

Starting Date:13/07/2002

Completion Date: 15/07/2003

Projects Value: US $ 3,340,844

 

Hospitals infrastructure works:

(1) Refurbishment and renovation of the hospitals infrastructure mechanical works, external sewerage network and steam boilers.

(2) Renovation of kitchen equipment and faucets.

(3) Renovation of electrical works infrastructure of site and associated building as

well as installing and commissioning of new power generator.

 

(4) Renovation of electrical works infrastructure of site and associated building as well as installing and commissioning of new power generator.

 

(5) Renovation of laundry equipment.

 

(6) Building an automated control system.

 

(7) Construction management and planning for all projects works.

 

(8) Special fire suppression, FM-200 & Co2 system.

 

 

 